# BUS4i Migrate 23 – IBM i Migration to Cloud & New Hardware

> Migrate IBM i to new Power hardware or IBM Power Virtual Server with BUS4i Migrate 23: just a TCP/IP connection, no tapes, restore runs alongside the backup.

URL: https://bus4i.com/bus4i-system-copy-migrate-23-for-ibm-power-i/

Business continuity software

# BUS4i Migrate 23: IBM i migration to the cloud and new hardware

With BUS4i System Copy, you migrate your IBM Power i without downtime to new hardware or to IBM Power Virtual Server in the IBM Cloud. Your day-to-day business keeps running while the data is transferred.

The data is transferred efficiently, so the switch to the new target system – on-premises or on IBM Power Virtual Server – happens without downtime.

[Discuss your migration](https://bus4i.com/contact-us/)

## What is BUS4i Migrate 23?

BUS4i Migrate 23 (System Copy) is migration software for IBM i (formerly AS/400 and iSeries). It transfers the user data of your system without downtime over a TCP/IP connection to new IBM Power hardware or to IBM Power Virtual Server, with no tapes and no extra storage. The restore starts while the backup is still running. It is made by T.S.P. Gesellschaft für Informationssysteme mbH in Karlsruhe, Germany.

Cloud on the fly

## The cloud is not a place, but an operating model

If you want to move your IBM Power i server to such a modern operating model, BUS4i business continuity solutions help you do so risk-free and without interrupting your day-to-day business.

In addition, BUS4i enables seamless business continuity at all times with every common cloud provider (IBM, Microsoft, Google) and in every variant – from private to hybrid to public cloud – with the usual BUS4i quality and depth of support. For migration with BUS4i Migrate 23, the cloud target is IBM Power Virtual Server.

If the switch-over is to take place during live operation with temporary mirroring, use [live migration with BUS4i Migrate While Active](https://bus4i.com/bus4i-migrate-while-active/).

Migration

## Simple and without interrupting operations

BUS4i System Copy simplifies relocating and migrating your IBM i to another IBM i system, whether on-premises or on IBM Power Virtual Server.

-   **Effortless backup and restore:** no tapes and no additional storage required – a simple IP connection is sufficient.
-   The restore process starts at the same time as the backup.
-   **Email notification:** you receive an email as soon as the restore is complete.
-   **User-friendly:** the entire process is designed for ease of use.
-   You can test your new system at your own pace before switching over.

Step by step

## How Migrate 23 works

1. ### Prepare the target system
   
   The new IBM i target system is set up. This creates the prerequisites for transferring data between the primary system and the target system.
2. ### Transfer data
   
   The relevant data is transferred from the primary system to the target system. Step by step, the new system is prepared for the switch-over.
3. ### Switch systems
   
   Once the data transfer is complete, you switch to the new IBM i system. Before that, you can test it at your own pace.

References

## Satisfied customers

-   ![Dachser SE](/img/customers/dachser.jpg)
-   ![MTS Group](/img/customers/mts.png)
-   ![Rutronik](/img/customers/rutronik.png)
-   ![VAUDE](/img/customers/vaude.svg)

The BUS4i product family

## More solutions for your IBM Power i

High availability

### BUS4i HA

Real-time mirroring between primary and secondary systems, combined with automatic switch-over to redundant systems, keeps business-critical applications running.

[High availability with BUS4i HA](https://bus4i.com/bus4i-ha/)

Disaster recovery

### BUS4i DR

Recovery of IBM Power i systems based on backups, including the restoration of deleted data. No second IBM Power machine required.

[Disaster recovery with BUS4i DR](https://bus4i.com/bus4i-dr-for-ibm-power-i/)

Migration during live operation

### BUS4i Migrate While Active

Migration of IBM Power i systems without interrupting ongoing processes: continuous data transfer and synchronization, followed by the switch-over to the target system.

[Migration during live operation with BUS4i Migrate While Active](https://bus4i.com/bus4i-migrate-while-active/)

Snapshots in the IBM Cloud

### BUS4i SNAP

Consistent system snapshots for fast backup, recovery and additional protection of your IBM Power i environment.

[Snapshots in the IBM Cloud with BUS4i SNAP](https://bus4i.com/bus4i-snap/)

Journal management

### BUS4i JOMA4i

Automated management and cleanup of IBM Power i journals: less storage consumption and system load, more stability and performance.

[Journal management with BUS4i JOMA4i](https://bus4i.com/bus4i-joma4i/)

## Frequently asked questions

### What is the difference between BUS4i Migrate 23 and BUS4i Migrate While Active?

Both migrate your IBM i without downtime. BUS4i Migrate 23 is software: it transfers the user data of your system over a TCP/IP connection, with backup and restore running in parallel. You can also use it to create copies of your system for testing. [BUS4i Migrate While Active](https://bus4i.com/bus4i-migrate-while-active/) is a professional service we carry out for you: we temporarily mirror your data to the new system and keep both in sync until the switch-over.

### What does BUS4i Migrate 23 transfer?

The user data of your IBM i system. It is transferred to the new system over a TCP/IP connection.

### What does the “23” in BUS4i Migrate 23 stand for?

For the IBM i backup option GO SAVE 23, which saves all user data. BUS4i Migrate 23 transfers exactly this data to the new system over TCP/IP, without tapes.

### Do I need tapes or additional storage?

No. A simple IP connection between the old and the new system is all you need. The restore starts while the backup is still running, and you receive an email as soon as it is complete.

### Where can I migrate my IBM i to?

To new IBM Power hardware or to the IBM Cloud. In the cloud, the target is exclusively IBM Power Virtual Server.

### Can I test the new system before switching over?

Yes. You can test your new system at your own pace before you switch to it.

### Can I also use BUS4i Migrate 23 for test systems?

Yes. With the system copy you can set up not only new production systems but also copies of your system for testing.

### Can I move to a newer IBM i version during the migration?

Yes. You can also move from an older to a newer IBM i version when you migrate.

## Plan your migration

We will show you how to move your IBM Power i to new hardware or to IBM Power Virtual Server with BUS4i Migrate 23.

[Discuss your migration](https://bus4i.com/contact-us/) [+49 721 504471 0](tel:+497215044710)
